View Single Post
Old 12-26-07, 02:27 PM   #10
Kron161
Sailor man
 
Join Date: Mar 2001
Posts: 47
Downloads: 7
Uploads: 0
Default

aaa
Quote:
Originally Posted by Johann Vilthomsen
So, today I've spent some spare times to put the rubber carpet on the floor.


First, i've vacuumed and mopped the original wood floor and ensure that the double side tape gets a firm hold. I intend to install everything in this room in a way that if one unlikely day i have to, I can revert easily to the room's original condition (i've even stored in a safe place the original door and its frame).


Then is time to unfold the rubber. (heavy as hell!) and adjust it to the wall


With the first half adjusted and glued with double side tape, I align and adjust the second half, also with double side tape.
.

That's it! now time to vaccuum it and a make a decent mopping to leave it with a terrific look!


Now I install again the computer's internet router and tomorrow, that is the first of a 4 day bank holiday, I hope to be able to work more and advance some with the lining of the walls and the pressure hull construction.

Kron161 is offline   Reply With Quote